History
Plans for the Circle Line date back to the 1980s. The then Minister for Communications and Information, Dr Yeo Ning Hong stated that such a system "it would be feasible when the population reaches four million".
In the 1990s, the Circle Line was first known as the Marina Line. The Marina Line was initially planned as a 12-station underground line, starting from Chinatown and Dhoby Ghaut via the National Stadium to either Kallang or Paya Lebar station. However, the Chinatown leg was later truncated and was reduced to 6 stations up to Stadium station. On the other hand, a further extension towards Upper Paya Lebar was added. Eventually, the Marina Line ended up as an inner circular line. Stations in Circle Line that were a part of the original Marina Line plans include Dhoby Ghaut, Bras Basah, Esplanade, Promenade, Nicoll Highway and Stadium. Also, the part of the Marina Line from Chinatown Station to Promenade Station is now part of the Downtown Line.
Originally scheduled to be opened from 2006 and fully opened in 2010, with an estimated cost of S$6.7 billion, the Nicoll Highway collapse caused the construction of the line to be delayed. As a result, the opening of the Circle Line was delayed to 2009, with full opening by 2011 (excluding the Marina Bay Extension), at an escalated cost of nearly S$10 billion. Due to the re-alignment of the Nicoll Highway Station to a new location, the station is only two-thirds the size of the original plan before the collapse, and located 100 metres (330 ft) away from the highway collapse site. The decision was also made to open both Caldecott, and Haw Par Villa stations (previously Thomson and West Coast), initially planned as shell stations, together with the whole line, leaving only Bukit Brown Station closed.
Stage 3, a 5 kilometres (3.1 mi) five-station segment stretching from Bartley to Marymount, was the first section of the line opened, on May 28, 2009. Ridership on this section has been considerably lower than estimated, at 32,000 passengers per day (ppd) instead of the estimated 55,000 ppd. Tunneling works for the entire line were completed on August 17, 2009. Stages 1 and 2 started operations on April 17, 2010, Stages 4 and 5 on October 8, 2011. and the final Circle Line Extension on January 14, 2012.
- 28 May 2009: Stage 3 (Bartley - Marymount) opened
- 17 April 2010: Stage 1 and 2 (Dhoby Ghaut - Bartley) opened
- 8 October 2011: Stage 4 and 5 (Marymount - HarbourFront) opened
- 14 January 2012: Circle Line Extension (CCLe) (Promenade - Marina Bay) opened
Read more about this topic: Circle MRT Line
Famous quotes containing the word history:
“He wrote in prison, not a History of the World, like Raleigh, but an American book which I think will live longer than that. I do not know of such words, uttered under such circumstances, and so copiously withal, in Roman or English or any history.”
—Henry David Thoreau (18171862)
“Postmodernism is, almost by definition, a transitional cusp of social, cultural, economic and ideological history when modernisms high-minded principles and preoccupations have ceased to function, but before they have been replaced with a totally new system of values. It represents a moment of suspension before the batteries are recharged for the new millennium, an acknowledgment that preceding the future is a strange and hybrid interregnum that might be called the last gasp of the past.”
—Gilbert Adair, British author, critic. Sunday Times: Books (London, April 21, 1991)
“Three million of such stones would be needed before the work was done. Three million stones of an average weight of 5,000 pounds, every stone cut precisely to fit into its destined place in the great pyramid. From the quarries they pulled the stones across the desert to the banks of the Nile. Never in the history of the world had so great a task been performed. Their faith gave them strength, and their joy gave them song.”
—William Faulkner (18971962)