Yonge-University-Spadina - Automatic Train Control

Automatic Train Control

The TTC estimates that automatic train control on the Yonge–University–Spadina line could be installed by 2016. When this system is installed, the TTC will be able to run trains as often as every 105 seconds. The limit of the signal system now is every 150 seconds, the interval at which trains operate at rush hours.

Read more about this topic:  Yonge-University-Spadina

Famous quotes containing the words automatic, train and/or control:

    What we learn for the sake of knowing, we hold; what we learn for the sake of accomplishing some ulterior end, we forget as soon as that end has been gained. This, too, is automatic action in the constitution of the mind itself, and it is fortunate and merciful that it is so, for otherwise our minds would be soon only rubbish-rooms.
    Anna C. Brackett (1836–1911)

    The train rounds, bending to a scream,
    Taking the final level for the dive
    Under the river—
    Hart Crane (1899–1932)

    The basic tool for the manipulation of reality is the manipulation of words. If you can control the meaning of words, you can control the people who must use the words.
    Philip K. Dick (1928–1982)