Frankfurt Airport - Future Expansions

Future Expansions

With the inauguration of the fourth runway in October 2011, the airport should be able to handle the predicted demand of about 700,000 aircraft movements in 2020. To handle the predicted passenger amount of 90 million in 2020, a third terminal is scheduled to be built south of the existing terminals beginning in 2013.

Terminal 3

Fraport plans to build a large new terminal south of the existing terminals at the ground of the former Rhein-Main Air Base. The new Terminal 3 should be able to house up to 25 million passengers and will feature 75 new aircraft positions. An extension of the people mover system SkyLine is planned to transport people to Terminal 1, the airport railway stations and Terminal 2.

Read more about this topic:  Frankfurt Airport

Famous quotes containing the word future:

    Perfect present has no existence in our consciousness. As I said years ago in Erewhon, it lives but upon the sufferance of past and future. We are like men standing on a narrow footbridge over a railway. We can watch the future hurrying like an express train towards us, and then hurrying into the past, but in the narrow strip of present we cannot see it. Strange that that which is the most essential to our consciousness should be exactly that of which we are least definitely conscious.
    Samuel Butler (1835–1902)