Varsity Stadium - New Facilities

New Facilities

Facilities and features built in the first phase of the stadium's reconstruction include an IAAF Class II 400m eight-lane track, artificial field turf (FIFA 2 Star rated surface by Polytan), and a winter bubble enabling use during inclement weather. The multi-use capability was one of the main reasons that the plan was passed by the governing council, as opposed to the 25,000 seat stadium. Compared to the old Varsity Stadium, the seating is closer to Varsity Arena, almost making the two structures one conjoined complex. Part of the red brick wall along Bloor Street was maintained for historic purposes, but the new facility is much more open and visible from the streets overall. The new facilities are designed by Diamond and Schmitt Architects.

Read more about this topic:  Varsity Stadium

Famous quotes containing the word facilities:

    I have always found that when men have exhausted their own resources, they fall back on “the intentions of the Creator.” But their platitudes have ceased to have any influence with those women who believe they have the same facilities for communication with the Divine mind as men have.
    Elizabeth Cady Stanton (1815–1902)

    Marriage is good enough for the lower classes: they have facilities for desertion that are denied to us.
    George Bernard Shaw (1856–1950)