UTA Aerodynamics Research Center - Hypersonic Shock Tunnel

Hypersonic Shock Tunnel

The hypersonic shock tunnel is another impulse facility with a run time of 0.5 to 5.0 ms. The tunnel has a test section of 0.44 meters (diameter) by a length of 1 meter. The inviscid core is 0.17 m at Mach 8. It is capable of testing at Mach numbers from 5 to 16 and Reynolds numbers from 100 to 20 million per meter. The tunnel can be modified to accommodate a detonation driver using a mixture of hydrogen, oxygen and helium. This was completed in 1991, and led to a $1,000,000 grant to form the NASA/UTA Center for Hypersonic Research between 1993 and 1998.

Read more about this topic:  UTA Aerodynamics Research Center

Famous quotes containing the words shock and/or tunnel:

    It is a great shock at the age of five or six to find that in a world of Gary Coopers you are the Indian.
    James Baldwin (1924–1987)

    You may raise enough money to tunnel a mountain, but you cannot raise money enough to hire a man who is minding his own business.
    Henry David Thoreau (1817–1862)