SBB-CFF-FFS Ae 6/6 - Demands On The Ae 6/6

Demands On The Ae 6/6

SBB needed a more powerful locomotive. The specification, created in 1949, included that the locomotive to be developed must be able the pull a 600 tonne train over the 26‰ gradients of the Gotthard line at 75 km/h. The first prototype with the number 11401 was scheduled for delivery in 1952.

Read more about this topic:  SBB-CFF-FFS Ae 6/6

Famous quotes containing the word demands:

    Reasonable orders are easy enough to obey; it is capricious, bureaucratic or plain idiotic demands that form the habit of discipline.
    Barbara Tuchman (1912–1989)