The complex is located in downtown Ottawa on Albert Street between Kent Street and Lyon. Towers A and B are located on the south side of Queen Street while tower C is on the north of Queen. The buildings are mostly home to various federal government workers, with the Department of Transport being the largest tenant. It has its headquarters in Tower C.
For almost a century the area had been home to the city's streetcar garages. The streetcar system was shuttered in 1959. The land was purchased later by developer Robert Campeau. He conceived an ambitious plan to recentre Ottawa's downtown on the site. The scheme faced several barriers, the most important of which was that for many years buildings in downtown Ottawa faced a 45.7 metre (150 foot) height restriction so the Peace Tower would dominate the skyline. Despite strong opposition from Ottawa mayor Charlotte Whitton, the rule was changed to allow the only somewhat taller Towers A and B to be constructed. These two towers were completed in 1968. That same year Campeau began lobbying to build the much taller Tower C. Originally hoping to build a 145 metre (475 foot) tower (which would have made it about 42 storeys), although approved by the city, the National Capital Commission allowed it to only be 112 metres (367 feet) (29 storeys), but it was, and remains, the tallest building in the city.
In the early 1980s Campeau proposed building a fourth even taller tower but a deep recession and a glut of Ottawa office space ended these plans. The buildings also began to suffer a variety of problems including asbestos, mould, a fire and allegations of Sick Building Syndrome. In the late 1980s Towers A and B were gutted and completely renovated. Campeau's business empire was also struggling and after failed expansion attempts in the United States his company collapsed. In 1996 its remnants, including Place de Ville, were bought by the Reichmann's Olympia and York (O&Y).
In 2000 O&Y announced that work would begin on a third phase of the Place de Ville complex. This would consist of two new towers one 18 storeys and the other 12. They would be built on the large parking lot next to Tower B. Several other downtown building projects and another economic downturn put these plans on hold, however. In February 2005 O&Y announced it would be selling most of its Canadian holdings, including Place de Ville.
Place de Ville is now managed by Brookfield Properties who have now made plans to replace the 4 storey 'Podium' building with a new 19 floor office tower including a 2 level link between it and tower C. This link would include a new entrance to the underground concourse (replacing the dingy old escalators in tower C). There are also plans to possibly connect the underground concourse to a planned subway station under Queen street between PdV I and PdV II.
Read more about this topic: Place De Ville
Famous quotes containing the words history and/or development:
“No one can understand Paris and its history who does not understand that its fierceness is the balance and justification of its frivolity. It is called a city of pleasure; but it may also very specially be called a city of pain. The crown of roses is also a crown of thorns. Its people are too prone to hurt others, but quite ready also to hurt themselves. They are martyrs for religion, they are martyrs for irreligion; they are even martyrs for immorality.”
—Gilbert Keith Chesterton (18741936)
“Women, because of their colonial relationship to men, have to fight for their own independence. This fight for our own independence will lead to the growth and development of the revolutionary movement in this country. Only the independent woman can be truly effective in the larger revolutionary struggle.”
—Womens Liberation Workshop, Students for a Democratic Society, Radical political/social activist organization. Liberation of Women, in New Left Notes (July 10, 1967)