Ohio State Route 11 - History

History

  • 1969 – Original route certified; Canfield to Austintown completed.
  • 1970 – From 5 miles (8.0 km) north of East Liverpool (State Route 7 exit north) to West Point (U.S. Route 30 exit west) completed; Austintown to Interstate 80 west completed.
  • 1971 – East Liverpool to 5 miles (8.0 km) north of East Liverpool completed; West Point to State Route 165 completed.
  • 1972 – Entire route completed.
  • 1976 – State Route 82 to State Route 5 upgrades from 4-lane divided highway to freeway complete.
  • 1980 – State Route 5 to State Route 307 upgrades from 4-lane divided highway to freeway complete.

Read more about this topic:  Ohio State Route 11

Famous quotes containing the word history:

    There is one great fact, characteristic of this our nineteenth century, a fact which no party dares deny. On the one hand, there have started into life industrial and scientific forces which no epoch of former human history had ever suspected. On the other hand, there exist symptoms of decay, far surpassing the horrors recorded of the latter times of the Roman empire. In our days everything seems pregnant with its contrary.
    Karl Marx (1818–1883)

    One classic American landscape haunts all of American literature. It is a picture of Eden, perceived at the instant of history when corruption has just begun to set in. The serpent has shown his scaly head in the undergrowth. The apple gleams on the tree. The old drama of the Fall is ready to start all over again.
    Jonathan Raban (b. 1942)

    The history of our era is the nauseating and repulsive history of the crucifixion of the procreative body for the glorification of the spirit.
    —D.H. (David Herbert)