NZR DM Class - Operation

Operation

The class operated in two configurations:

  • Two-car unit (DM-D). Used on the steep Johnsonville Line until March 2012, as four-car trains for peak and two-car trains off-peak and weekend; 38.4 metres long with a tare weight of 69.7 t, full seated load 79.9 t. Until March 2012 there were 11 two-car units in service.
  • Three-car unit (D-DM-D). Mainly used on the Wellington to Taita and Melling lines; 57.5 metres long with a tare weight of 99.5 t.

The class were amongst the oldest rolling stock operated by KiwiRail. The last units in service were the 46 stock introduced in 1949 to 1954 - 36/42 stock were withdrawn in the early 1980s.

Read more about this topic:  NZR DM Class

Famous quotes containing the word operation:

    You may read any quantity of books, and you may almost as ignorant as you were at starting, if you don’t have, at the back of your minds, the change for words in definite images which can only be acquired through the operation of your observing faculties on the phenomena of nature.
    Thomas Henry Huxley (1825–95)

    It is critical vision alone which can mitigate the unimpeded operation of the automatic.
    Marshall McLuhan (1911–1980)

    Waiting for the race to become official, he began to feel as if he had as much effect on the final outcome of the operation as a single piece of a jumbo jigsaw puzzle has to its predetermined final design. Only the addition of the missing fragments of the puzzle would reveal if the picture was as he guessed it would be.
    Stanley Kubrick (b. 1928)