NZR DM Class - Operation

Operation

The class operated in two configurations:

  • Two-car unit (DM-D). Used on the steep Johnsonville Line until March 2012, as four-car trains for peak and two-car trains off-peak and weekend; 38.4 metres long with a tare weight of 69.7 t, full seated load 79.9 t. Until March 2012 there were 11 two-car units in service.
  • Three-car unit (D-DM-D). Mainly used on the Wellington to Taita and Melling lines; 57.5 metres long with a tare weight of 99.5 t.

The class were amongst the oldest rolling stock operated by KiwiRail. The last units in service were the 46 stock introduced in 1949 to 1954 - 36/42 stock were withdrawn in the early 1980s.

Read more about this topic:  NZR DM Class

Famous quotes containing the word operation:

    It requires a surgical operation to get a joke well into a Scotch understanding. The only idea of wit, or rather that inferior variety of the electric talent which prevails occasionally in the North, and which, under the name of “Wut,” is so infinitely distressing to people of good taste, is laughing immoderately at stated intervals.
    Sydney Smith (1771–1845)

    You may read any quantity of books, and you may almost as ignorant as you were at starting, if you don’t have, at the back of your minds, the change for words in definite images which can only be acquired through the operation of your observing faculties on the phenomena of nature.
    Thomas Henry Huxley (1825–95)

    Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.
    Francis Bacon (1560–1626)