Nevada Solar One - History

History

In 2006, located 30 miles north of Tucson, Arizona Public Service's Saguaro Solar Facility opened, with 1 MW of electrical generation capacity. Nevada Solar One went online for commercial use on June 27, 2007. It use similar technology and was constructed over a period of 16 months. The total project site is approximately 400 acres (0.6 mi² / 1.6 km²), while the solar collectors cover 300 acres (1.2 km2).

Read more about this topic:  Nevada Solar One

Famous quotes containing the word history:

    In history an additional result is commonly produced by human actions beyond that which they aim at and obtain—that which they immediately recognize and desire. They gratify their own interest; but something further is thereby accomplished, latent in the actions in question, though not present to their consciousness, and not included in their design.
    Georg Wilhelm Friedrich Hegel (1770–1831)

    The one duty we owe to history is to rewrite it.
    Oscar Wilde (1854–1900)

    History, as an entirety, could only exist in the eyes of an observer outside it and outside the world. History only exists, in the final analysis, for God.
    Albert Camus (1913–1960)