Development
Trains from south of the River Thames on the extended Thameslink network may call at the station from 2018, when the present Sutton Loop trains will terminate at London Blackfriars.
After the bay platforms at Blackfriars station closed in March 2009, Southeastern services which previously terminated at Blackfriars were extended to Kentish Town (off-peak), or St Albans, Luton or Bedford (peak hours).
A major upgrading of the whole Thameslink line infrastructure is underway, for expected completion by 2018. However, the four platforms at Kentish Town station are not being extended from 8 to 12 carriages because of road bridges at each end which cannot be relocated, so only services that continue to be served by 8-car trains will be able to call there. The only other Thameslink stations north of the River Thames remaining with 8-car platform lengths will be Hendon and Cricklewood, which are sited either side of a possible new Thameslink station at Brent Cross.
Read more about this topic: Kentish Town Station
Famous quotes containing the word development:
“I have an intense personal interest in making the use of American capital in the development of China an instrument for the promotion of the welfare of China, and an increase in her material prosperity without entanglements or creating embarrassment affecting the growth of her independent political power, and the preservation of her territorial integrity.”
—William Howard Taft (18571930)
“I could not undertake to form a nucleus of an institution for the development of infant minds, where none already existed. It would be too cruel.”
—Henry David Thoreau (18171862)
“The American has dwindled into an Odd Fellowone who may be known by the development of his organ of gregariousness.”
—Henry David Thoreau (18171862)