Kallang MRT Station - Platform Screen Doors

Platform Screen Doors

As with most of the above-ground stations along the East West Line, it was built without platform screen doors to prevent commuters from falling onto the train tracks. Installation of half-height platform screen doors was started on 19 December 2010 and started operation on 25 February 2011 with Kembangan.

Read more about this topic:  Kallang MRT Station

Famous quotes containing the words platform, screen and/or doors:

    “It was a favor for which to be forever silent to be shown this vision. The earth beneath had become such a flitting thing of lights and shadows as the clouds had been before. It was not merely veiled to me, but it had passed away like the phantom of a shadow, skias onar, and this new platform was gained. As I had climbed above storm and cloud, so by successive days’ journeys I might reach the region of eternal day, beyond the tapering shadow of the earth.”
    —Henry David Thoreau (1817–1862)

    “Every obstruction of the course of justice,—is a door opened to betray society, and bereave us of those blessings which it has in view.... It is a strange way of doing honour to God, to screen actions which are a disgrace to humanity.”
    —Laurence Sterne (1713–1768)

    “Unfortunately, it is much easier to shut one’s eyes to good than to evil. Pain and sorrow knock at our doors more loudly than pleasure and happiness; and the prints of their heavy footsteps are less easily effaced.”
    —Thomas Henry Huxley (1825–95)