Current Facilities
High Point Solutions Stadium underwent significant construction from 2008 to 2009 to increase capacity to 52,454, which is its current maximum capacity. The stadium features two 5,000-seat upper decks on each side of the playing field, as well as 968 loge and club seats on the mezzanine level of the East side of the stadium. A two-story press box is present on the mezzanine level of the West side of the stadium. Electronic ribbon scoreboards spanning the length of the field along the bottom of both upper decks were installed prior to the 2008 season, which compliment the video scoreboard in the South end zone. Also located in the South end zone is the Brown Football Recruiting Pavilion and Welcome Center, which was included in the 2008-2009 expansion project.
The stadium also features light stanchions that allow for night games, a cannon for firing when Rutgers scores, concessions, and restrooms. Until 2004, the field maintained a grass surface, but has since been replaced with Field Turf.
Read more about this topic: High Point Solutions Stadium
Famous quotes containing the words current and/or facilities:
“We set up a certain aim, and put ourselves of our own will into the power of a certain current. Once having done that, we find ourselves committed to usages and customs which we had not before fully known, but from which we cannot depart without giving up the end which we have chosen. But we have no right, therefore, to claim that we are under the yoke of necessity. We might as well say that the man whom we see struggling vainly in the current of Niagara could not have helped jumping in.”
—Anna C. Brackett (18361911)
“Marriage is good enough for the lower classes: they have facilities for desertion that are denied to us.”
—George Bernard Shaw (18561950)