Central Link

Central Link is a light rail line running between downtown Seattle and Seattle-Tacoma International Airport. It is the initial phase of Sound Transit's Link Light Rail system. Service operates seven days a week, from 5 am to 1 am Monday through Saturday and from 6 am to midnight on Sundays. Trains are composed of two cars, each with a capacity of 200 passengers—74 seated and 126 standing. Opened on July 18, 2009, Central Link initially operated between downtown Seattle and Tukwila, on a 13.9-mile (22.4 km) route. Service was extended by 1.7 miles (2.7 km) from Tukwila to SeaTac Airport on December 19, 2009.

Read more about Central Link:  Routing, Stations, Fares, Headways, Travel Times, Ridership, Equipment

Famous quotes containing the words central and/or link:

    “It’s easy to forget how central the French people are in everything we mean when we say Europe.”
    —John Dos Passos (1896–1970)

    “Before I had my first child, I never really looked forward in anticipation to the future. As I watched my son grow and learn, I began to imagine the world this generation of children would live in. I thought of the children they would have, and of their children. I felt connected to life both before my time and beyond it. Children are our link to future generations that we will never see.”
    —Louise Hart (20th century)