Capacity Factor

The net capacity factor of a power plant is the ratio of the actual output of a power plant over a period of time and its potential output if it had operated at full nameplate capacity the entire time. To calculate the capacity factor, take the total amount of energy the plant produced during a period of time and divide by the amount of energy the plant would have produced at full capacity. Capacity factors vary greatly depending on the type of fuel that is used and the design of the plant. The capacity factor should not be confused with the availability factor, capacity credit (firm capacity) or with efficiency.

Read more about Capacity Factor:  Reasons For Reduced Capacity Factor, Load Following Power Plants, Capacity Factor and Renewable Energy, Typical Capacity Factors

Famous quotes containing the words capacity and/or factor:

    People between twenty and forty are not sympathetic. The child has the capacity to do but it can’t know. It only knows when it is no longer able to do—after forty. Between twenty and forty the will of the child to do gets stronger, more dangerous, but it has not begun to learn to know yet. Since his capacity to do is forced into channels of evil through environment and pressures, man is strong before he is moral. The world’s anguish is caused by people between twenty and forty.
    William Faulkner (1897–1962)

    Weapons are an important factor in war, but not the decisive factor; it is people, not things, that are decisive. The contest of strength is not only a contest of military and economic power, but also a contest of human power and morale. Military and economic power is necessarily wielded by people.
    Mao Zedong (1893–1976)