The capital costs of implementing BRT lines can be lower than up-front costs of constructing LRT lines. A study by the United States Government Accountability Office found that the average capital cost per mile for busways was $13.5 million while light rail average costs were $34.8 million. However, a huge range of capital costs can be seen, as BRT lines can cost anywhere from $200,000—$55 million per mile, while LRT lines can range from $12.4—$118.8 million per mile. The total investment varies considerably due to factors such as cost of the roadway, station structures, park-and-ride facilities, traffic signal systems and vehicles.
The costs of a running a BRT system is about $13.49 a mile and the total cost for a year of expenditure is $987.80 according to a study done by the GAO. Running a BRT system is much less expensive than running a light rail system. The BRT is also much less expensive than a trolley system.
Read more about this topic: Bus Rapid Transit
Famous quotes containing the word cost:
“One must always be aware, to noticeeven though the cost of noticing is to become responsible.”
—Thylias Moss, African American poet. As quoted in the Wall Street Journal (May 12, 1994)
“Oh high is the price of parenthood,
And daughters may cost you double.
You dare not forget, as you thought you could,
That youth is a plague and a trouble.”
—Phyllis McGinley (20th century)
“Mining today is an affair of mathematics, of finance, of the latest in engineering skill. Cautious men behind polished desks in San Francisco figure out in advance the amount of metal to a cubic yard, the number of yards washed a day, the cost of each operation. They have no need of grubstakes.”
—Merle Colby, U.S. public relief program (1935-1943)