Burnside Bridge - Design

Design

The bridge was design by Ira G. Hedrick. Including approaches, the Burnside has a total length of 2,308 ft (703 m) and a 251 ft (77 m) center span. While lowered this span is normally 64 ft (20 m) above the river. The deck is made of concrete, which contributes to its being one of the heaviest bascule bridges in the United States. The counterweights, housed inside the two piers, weigh 1,700 short tons (1,518 long tons; 1,542 t). The lifting is normally controlled by the Hawthorne Bridge operator, but an operator staffs the west tower during high river levels.

The bridge provides shelter for the initially unauthorized Burnside Skatepark under the east end. On weekends, the Portland Saturday Market was held mostly under the bridge's west end for many years. The market was reoriented in 2009, but the Burnside Bridge continues to provide shelter for a few vendor stalls at the market's northern end.

Read more about this topic:  Burnside Bridge

Famous quotes containing the word design:

    To nourish children and raise them against odds is in any time, any place, more valuable than to fix bolts in cars or design nuclear weapons.
    Marilyn French (20th century)

    Delay always breeds danger; and to protract a great design is often to ruin it.
    Miguel De Cervantes (1547–1616)

    I always consider the settlement of America with reverence and wonder, as the opening of a grand scene and design in providence, for the illumination of the ignorant and the emancipation of the slavish part of mankind all over the earth.
    John Adams (1735–1826)