Ames Research Center - Arc Jet Complex

Arc Jet Complex

The Ames Arc Jet Complex has seven available test bays. At the present time, four bays contain Arc Jet units of differing configurations, serviced by common facility support equipment. These are the Aerodynamic Heating Facility (AHF), the Turbulent Flow Duct (TFD), the Panel Test Facility (PTF), and the Interaction Heating Facility (IHF). The support equipment includes two D.C. power supplies, a steam ejector-driven vacuum system, a water-cooling system, high-pressure gas systems, data acquisition system, and other auxiliary systems.

The magnitude and capacity of these systems makes the Ames Arc Jet Complex unique in the world. The largest power supply can deliver 75 megawatts(MW) for a 30 minute duration or 150 MW for a 15 second duration. This power capacity, in combination with a high-volume 5-stage steam ejector vacuum-pumping system, enables facility operations to match high-altitude atmospheric flight conditions with samples of relatively large size. The Thermo-Physics Facilities Branch operates four arc jet facilities. The Interaction Heating Facility (IHF), with an available power of over 60-MW, is one of the highest-power arc jets available. It is a very flexible facility, capable of long run times of up to one hour, and able to test large samples in both a stagnation and flat plate configuration. The Panel Test Facility (PTF) uses a unique semielliptic nozzle for testing panel sections. Powered by a 20-MW arc heater, the PTF can perform tests on samples for up to 20 minutes. The Turbulent Flow Duct provides supersonic, turbulent high temperature air flows over flat surfaces. The TFD is powered by a 20-MW Hüls arc heater and can test samples 203 by 508 millimeters (8.0 by 20.0 in) in size. The Aerodynamic Heating Facility (AHF) has similar characteristics to the IHF arc heater, offering a wide range of operating conditions, samples sizes and extended test times. A cold-air-mixing plenum allows for simulations of ascent or high-speed flight conditions. Catalycity studies using air or nitrogen can be performed in this flexible rig. A 5-arm model support system allows the user to maximize testing efficiency. The AHF can be configured with either a Hüls or segmented arc heater, up to 20-MW. 1 MW is enough power to supply 750 homes.

Read more about this topic:  Ames Research Center

Famous quotes containing the words arc, jet and/or complex:

    Male urination really is a kind of accomplishment, an arc of transcendance. A woman merely waters the ground she stands on.
    Camille Paglia (b. 1947)

    Gimme the Plaza, the jet and $150 million, too.
    Headline, New York Post (Feb. 13, 1990)

    What we do is as American as lynch mobs. America has always been a complex place.
    Jerry Garcia (1942–1995)