Every five years, starting the day after Labor Day, the New Jersey Department of Environmental Protection’s (DEP) water level management plan allows the lake to be lowered five feet to allow for inspection of the dam structure, property owners’ repairs to lakeshore structures, aquatic vegetation control, and silt and drainage material removal from areas around the lake.

From December 2008 to January 2009, the DEP left the dam open almost three weeks too long, which caused the water level to drop almost a foot below the normal drawdown level. A coalition of residents and business owners filed suit against the DEP and the State of New Jersey, and it is currently being appealed in local court. The suit claims that the DEP, against their own policy, carelessly allowed an excess of 1.5 billion US gallons (5,700,000 m3) of water to be released through the dam.

On May 11, 2009, the American Power Boat Association (APBA) and the Lake Hopatcong Racing Association (LHRA) decided to postpone their annual races due to the low water level. However, with the large amount of rainfall that was recorded in the month of June, the lake returned to its proper level above the normal average depth. The return of the water level came just in time for the beginning of summer and the arrival of the weather required for boating.

Read more about this topic:  Lake Hopatcong