Bay Area Rapid Transit - Future Expansion and Extension

Future Expansion and Extension

Expansion projects for the Bay Area Rapid Transit have existed ever since the opening of the project. As well as the Oakland Airport connector, these projects include the Warm Springs extension, the San Jose extension, eBART, 'tBART': I-580/Tri-Valley Corridor, 'wBART': I-80/West Contra Costa Corridor, and numerous infill stations along the route.

On the Fremont line the Warm Springs extension is being built. It will be a precursor to Phase I of the San Jose extension that will begin construction in mid-2012, with stations at Milpitas and Berryessa. Heading east from Pittsburg/Bay Point, two additional stations are under construction and will be added to the system using a diesel multiple unit "eBART" train system with stations at Pittsburg and Antioch.

Read more about this topic:  Bay Area Rapid Transit

Famous quotes containing the words future, expansion and/or extension:

    Poetry is not only dream and vision; it is the skeleton architecture of our lives. It lays the foundations for a future of change, a bridge across our fears of what has never been before.
    Audre Lorde (1934–1992)

    Artistic genius is an expansion of monkey imitativeness.
    W. Winwood Reade (1838–1875)

    Slavery is founded on the selfishness of man’s nature—opposition to it on his love of justice. These principles are in eternal antagonism; and when brought into collision so fiercely as slavery extension brings them, shocks and throes and convulsions must ceaselessly follow.
    Abraham Lincoln (1809–1865)