Yosan Line - Basic Data

Basic Data

  • Operators, distances:
    • Shikoku Railway Company (JR Shikoku) (Services and tracks)
      • Takamatsu — Uwajima: 297.6 km (184.9 mi)
      • Mukaibara — Uchiko: 23.5 km (14.6 mi)
      • Niiya — Iyo-Ōzu: 5.9 km (3.7 mi)
    • Japan Freight Railway Company (JR Freight) (Services)
      • Takamatsu – Iyo-Yokota: 203.0 km (126.1 mi)
  • Double-tracked section: Takamatsu – Tadotsu
  • Railway signalling: Centralized Traffic Control (CTC)
  • Maximum speed:
    • Takamatsu – Matsuyama: 130 km/h (80 mph)
    • Matsuyama – Uchiko, Iyo-Iwaki – Unomachi: 120 km/h (75 mph)
    • Other sections: 110 km/h (70 mph)

Read more about this topic:  Yosan Line

Famous quotes containing the words basic and/or data:

    “A kiss can be a comma, a question mark or an exclamation point. That’s basic spelling that every woman ought to know.”
    —Mistinguett (1874–1956)

    “This city is neither a jungle nor the moon.... In long shot: a cosmic smudge, a conglomerate of bleeding energies. Close up, it is a fairly legible printed circuit, a transistorized labyrinth of beastly tracks, a data bank for asthmatic voice-prints.”
    —Susan Sontag (b. 1933)