Yosan Line - Basic Data

Basic Data

  • Operators, distances:
    • Shikoku Railway Company (JR Shikoku) (Services and tracks)
      • Takamatsu — Uwajima: 297.6 km (184.9 mi)
      • Mukaibara — Uchiko: 23.5 km (14.6 mi)
      • Niiya — Iyo-Ōzu: 5.9 km (3.7 mi)
    • Japan Freight Railway Company (JR Freight) (Services)
      • Takamatsu – Iyo-Yokota: 203.0 km (126.1 mi)
  • Double-tracked section: Takamatsu – Tadotsu
  • Railway signalling: Centralized Traffic Control (CTC)
  • Maximum speed:
    • Takamatsu – Matsuyama: 130 km/h (80 mph)
    • Matsuyama – Uchiko, Iyo-Iwaki – Unomachi: 120 km/h (75 mph)
    • Other sections: 110 km/h (70 mph)

Read more about this topic:  Yosan Line

Famous quotes containing the words basic and/or data:

    I fly in dreams, I know it is my privilege, I do not recall a single situation in dreams when I was unable to fly. To execute every sort of curve and angle with a light impulse, a flying mathematics—that is so distinct a happiness that it has permanently suffused my basic sense of happiness.
    Friedrich Nietzsche (1844–1900)

    Mental health data from the 1950’s on middle-aged women showed them to be a particularly distressed group, vulnerable to depression and feelings of uselessness. This isn’t surprising. If society tells you that your main role is to be attractive to men and you are getting crow’s feet, and to be a mother to children and yours are leaving home, no wonder you are distressed.
    Grace Baruch (20th century)