Yosan Line - Basic Data

Basic Data

  • Operators, distances:
    • Shikoku Railway Company (JR Shikoku) (Services and tracks)
      • Takamatsu — Uwajima: 297.6 km (184.9 mi)
      • Mukaibara — Uchiko: 23.5 km (14.6 mi)
      • Niiya — Iyo-Ōzu: 5.9 km (3.7 mi)
    • Japan Freight Railway Company (JR Freight) (Services)
      • Takamatsu – Iyo-Yokota: 203.0 km (126.1 mi)
  • Double-tracked section: Takamatsu – Tadotsu
  • Railway signalling: Centralized Traffic Control (CTC)
  • Maximum speed:
    • Takamatsu – Matsuyama: 130 km/h (80 mph)
    • Matsuyama – Uchiko, Iyo-Iwaki – Unomachi: 120 km/h (75 mph)
    • Other sections: 110 km/h (70 mph)

Read more about this topic:  Yosan Line

Famous quotes containing the words basic and/or data:

    ... the basic experience of everyone is the experience of human limitation.
    Flannery O’Connor (1925–1964)

    To write it, it took three months; to conceive it three minutes; to collect the data in it—all my life.
    F. Scott Fitzgerald (1896–1940)