Yosan Line - Basic Data

Basic Data

  • Operators, distances:
    • Shikoku Railway Company (JR Shikoku) (Services and tracks)
      • Takamatsu — Uwajima: 297.6 km (184.9 mi)
      • Mukaibara — Uchiko: 23.5 km (14.6 mi)
      • Niiya — Iyo-Ōzu: 5.9 km (3.7 mi)
    • Japan Freight Railway Company (JR Freight) (Services)
      • Takamatsu – Iyo-Yokota: 203.0 km (126.1 mi)
  • Double-tracked section: Takamatsu – Tadotsu
  • Railway signalling: Centralized Traffic Control (CTC)
  • Maximum speed:
    • Takamatsu – Matsuyama: 130 km/h (80 mph)
    • Matsuyama – Uchiko, Iyo-Iwaki – Unomachi: 120 km/h (75 mph)
    • Other sections: 110 km/h (70 mph)

Read more about this topic:  Yosan Line

Famous quotes containing the words basic and/or data:

    ... in Northern Ireland, if you don’t have basic Christianity, rather than merely religion, all you get out of the experience of living is bitterness.
    Bernadette Devlin (b. 1947)

    This city is neither a jungle nor the moon.... In long shot: a cosmic smudge, a conglomerate of bleeding energies. Close up, it is a fairly legible printed circuit, a transistorized labyrinth of beastly tracks, a data bank for asthmatic voice-prints.
    Susan Sontag (b. 1933)