Subway Operations
The Yokohama Municipal Subway consists of the following lines:
- Line 1 (Blue Line), from Kannai to Shōnandai, via Kami-Ōoka, Totsuka
- Line 3 (Blue Line), from Kannai to Azamino, via Sakuragichō, Yokohama and Shin-Yokohama.
- Line 4 (Green Line), from Hiyoshi to Nakayama
Lines 1 and 3 operate with trains running through from Shonandai to Azamino. At 40.4 km, this is the second-longest subway in Japan after the Toei Ōedo Line in Tokyo.
The missing Line 2 was planned to connect Kanagawa-Shinmachi Station with Byobugaura Station, along the Keikyū Main Line, but has been cancelled.
Although it runs entirely underground, the Minatomirai Line is not considered part of the subway network, and is not administered by the Transportation Bureau, but by the Yokohama Minatomirai Railway Company.
Read more about this topic: Yokohama City Transportation Bureau
Famous quotes containing the words subway and/or operations:
“In New Yorkwhose subway trains in particular have been tattooed with a brio and an energy to put our own rude practitioners to shamenot an inch of free space is spared except that of advertisements.... Even the most chronically dispossessed appear prepared to endorse the legitimacy of the haves.”
—Gilbert Adair, British author, critic. Cleaning and Cleansing, Myths and Memories (1986)
“It may seem strange that any road through such a wilderness should be passable, even in winter, when the snow is three or four feet deep, but at that season, wherever lumbering operations are actively carried on, teams are continually passing on the single track, and it becomes as smooth almost as a railway.”
—Henry David Thoreau (18171862)