Yates Analysis - Parameter Estimates As Terms Are Added

Parameter Estimates As Terms Are Added

In most cases of least squares fitting, the model coefficients for previously added terms change depending on what was successively added. For example, the X1 coefficient might change depending on whether or not an X2 term was included in the model. This is not the case when the design is orthogonal, as is a 23 full factorial design. For orthogonal designs, the estimates for the previously included terms do not change as additional terms are added. This means the ranked list of effect estimates simultaneously serves as the least squares coefficient estimates for progressively more complicated models.

Read more about this topic:  Yates Analysis

Famous quotes containing the words estimates, terms and/or added:

    Writing a book I have found to be like building a house. A man forms a plan, and collects materials. He thinks he has enough to raise a large and stately edifice; but after he has arranged, compacted and polished, his work turns out to be a very small performance. The authour however like the builder, knows how much labour his work has cost him; and therefore estimates it at a higher rate than other people think it deserves,
    James Boswell (1740–1795)

    Ay, ay, the best terms will grow obsolete: damns have had their day.
    Richard Brinsley Sheridan (1751–1816)

    From the point of view of the pharmaceutical industry, the AIDS problem has already been solved. After all, we already have a drug which can be sold at the incredible price of $8,000 an annual dose, and which has the added virtue of not diminishing the market by actually curing anyone.
    Barbara Ehrenreich (b. 1941)