History
The Wuppertal Schwebebahn had a forerunner: in 1824, Henry Robinson Palmer of England presented a railway system which differed from all previous constructions. It was basically a low single-rail suspension railway on which the carriages were drawn by horses. Friedrich Harkort, a Prussian industrial entrepreneur and politician, loved the idea. He saw big advantages for the transportation of coal to the early industrialised region in and around the Wupper valley. Harkort had his own steel mill in Elberfeld; he built a demonstration segment of the Palmer system and set it up in 1826 on the grounds of what is today the Wuppertal tax office. He therefore tried to attract public attention to his railway plans.
On 9 September 1826, the town councillors of Elberfeld met to discuss the use of a "Palmer's Railway" from the Ruhr region, Hinsbeck or Langenberg, to the Wupper valley, Elberfeld, connecting Harkort's factories. Friedrich Harkort inspected the projected route with a surveyor and a member of the town council. The plans never went ahead because of protests from the transport branch and owners of mills that were not on the routes.
In 1887 the cities of Elberfeld and Barmen formed a commission for the construction of an elevated railway or Hochbahn. In 1894 they chose the system of the engineer Eugen Langen of Cologne, and in 1896 the order was licensed by the City of Düsseldorf. In 2003, the Rhine Heritage Office (Rheinische Amt für Denkmalpflege des Landschaftsverbandes Rheinland or LVR) announced the discovery of an original section of the test route of the Wuppertal Schwebebahn.
Construction on the actual Wuppertal Schwebebahn began in 1898, overseen by the government's master builder, Wilhelm Feldmann. On 24 October 1900, William II, German Emperor participated in a monorail trial run.
In 1901 the railway came into operation. It opened in sections: the line from Kluse to Zoo/Stadion opened on 1 March, the line to the western terminus at Vohwinkel opened on 24 May, while the line to the eastern terminus at Oberbarmen did not open until 27 June 1903. Around 19,200 tonnes of steel were used to produce the supporting frame and the train stations. The construction cost 16 million Goldmark. Since its first opening, the railway has closed once owing to severe damage from World War II, but managed to open as early as 1946.
|
Read more about this topic: Wuppertal Schwebebahn
Famous quotes containing the word history:
“Revolutions are the periods of history when individuals count most.”
—Norman Mailer (b. 1923)
“At present cats have more purchasing power and influence than the poor of this planet. Accidents of geography and colonial history should no longer determine who gets the fish.”
—Derek Wall (b. 1965)
“Let us not underrate the value of a fact; it will one day flower in a truth. It is astonishing how few facts of importance are added in a century to the natural history of any animal. The natural history of man himself is still being gradually written.”
—Henry David Thoreau (18171862)