Sixth Bridge
A sixth bridge is under construction. A public inquiry rejected some aspects of the original plan but approval of the funding arrangements was confirmed on 29 December 2010. After extensive preparatory work in 2011, the main construction works began on 9 January 2012. Building is expected to finish by the summer of 2013. The bridge will replace the two existing bridges, which will remain in use until the new bridge is completed. The new £32.4 million bridge will have no piers in the river, thus opening up views along the river and improving navigation for boats.
Read more about this topic: Walton Bridge
Famous quotes containing the words sixth and/or bridge:
“If you are willing to inconvenience yourself in the name of discipline, the battle is half over. Leave Grandmas early if the children are acting impossible. Depart the ballpark in the sixth inning if youve warned the kids and their behavior is still poor. If we do something like this once, our kids will remember it for a long time.”
—Fred G. Gosman (20th century)
“In bridge clubs and in councils of state, the passions are the same.”
—Mason Cooley (b. 1927)