Constructed At Portland, Maine
Avery Island (AG-76) was laid down under a U.S. Maritime Commission contract (MCE hull 3085) on 31 October 1944 at South Portland, Maine, by the New England Shipbuilding Corporation; launched on 13 December 1944; sponsored by Mrs. Robert LeBourdais; and acquired by the Navy and commissioned on 21 December 1944, Lt. Comdr. J. H. Graves, Jr., in command.
Read more about this topic: USS Avery Island (AG-76)
Famous quotes containing the words constructed and/or maine:
“By day, Structuralists constructed the structure of meaning and pondered the meaning of structure. By night, Deconstructivists pulled the cortical edifice down. And the next day the Structuralists started in again.”
—Tom Wolfe (b. 1931)
“I have been oranging and fat,
carrot colored, gaped at,
allowing my cracked os to drop on the sea
near Venice and Mombasa.
Over Maine I have rested.”
—Anne Sexton (19281974)