History
As of November 2008, crews had completed concrete work two months ahead of schedule, wrapping up the concrete portion of construction with a roof deck pour for the Twins administration building, according to the Minnesota Ballpark Authority. In March 2009 Tekna Kleen (commercial cleaning company), started doing the finishing cleaning touches to Target Field. In late August, 2009, the playing field was installed.
Read more about this topic: Twins Ballpark
Famous quotes containing the word history:
“Three million of such stones would be needed before the work was done. Three million stones of an average weight of 5,000 pounds, every stone cut precisely to fit into its destined place in the great pyramid. From the quarries they pulled the stones across the desert to the banks of the Nile. Never in the history of the world had so great a task been performed. Their faith gave them strength, and their joy gave them song.”
—William Faulkner (18971962)
“History takes time.... History makes memory.”
—Gertrude Stein (18741946)
“No one is ahead of his time, it is only that the particular variety of creating his time is the one that his contemporaries who are also creating their own time refuse to accept.... For a very long time everybody refuses and then almost without a pause almost everybody accepts. In the history of the refused in the arts and literature the rapidity of the change is always startling.”
—Gertrude Stein (18741946)