Twins Ballpark - History

History

As of November 2008, crews had completed concrete work two months ahead of schedule, wrapping up the concrete portion of construction with a roof deck pour for the Twins administration building, according to the Minnesota Ballpark Authority. In March 2009 Tekna Kleen (commercial cleaning company), started doing the finishing cleaning touches to Target Field. In late August, 2009, the playing field was installed.

Read more about this topic:  Twins Ballpark

Famous quotes containing the word history:

    No one is ahead of his time, it is only that the particular variety of creating his time is the one that his contemporaries who are also creating their own time refuse to accept.... For a very long time everybody refuses and then almost without a pause almost everybody accepts. In the history of the refused in the arts and literature the rapidity of the change is always startling.
    Gertrude Stein (1874–1946)

    A man will not need to study history to find out what is best for his own culture.
    Henry David Thoreau (1817–1862)

    The one duty we owe to history is to rewrite it.
    Oscar Wilde (1854–1900)