Construction and Design

It was decided to build a new power station at Tarong in 1978, with work beginning in the following year. Initially it was expecting to be operating by October 1985 but this date was bought forward by 17 months to cover the expected growth in demand. 1 Unit was commissioned in May 1984, with 2 Unit following exactly 12 months later. 3 Unit was commissioned in February 1986, and finally 4 Unit was commissioned just 9 months later in November 1986. Thus the accelerated construction program included bringing forward the dates but also compressing the timeline.

The design included Queensland's first hyperbolic natural draught cooling towers which rise to 118 m. The power station has one chimney which is 20 m in diameter and rises 210 m. There are two control rooms. The total construction cost including water supply facilities was A$1,230 million.

Read more about this topic:  Tarong Power Station

Famous quotes containing the words construction and/or design:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)

    Joe ... you remember I said you wouldn’t be cheated?... Nobody is really. Eventually all things work out. There’s a design in everything.
    Sidney Buchman (1902–1975)