History
This model was defined by Barry Boehm in his 1986 article "A Spiral Model of Software Development and Enhancement". It was not the first model to discuss iterative development.
As originally envisioned, the iterations were typically 6 months to 2 years long. Each phase starts with a design goal and ends with the client (who may be internal) reviewing the progress thus far. Analysis and engineering efforts are applied at each phase of the project, with an eye toward the end goal of the project.
Read more about this topic: Spiral Model
Famous quotes containing the word history:
“The custard is setting; meanwhile
I not only have my own history to worry about
But am forced to fret over insufficient details related to large
Unfinished concepts that can never bring themselves to the point
Of being, with or without my help, if any were forthcoming.”
—John Ashbery (b. 1927)
“The true theater of history is therefore the temperate zone.”
—Georg Wilhelm Friedrich Hegel (17701831)
“The history of the Victorian Age will never be written: we know too much about it.”
—Lytton Strachey (18801932)