The Somerville Community Path is a project to build a mixed-use path in Somerville, Massachusetts, from the Cambridge border near Davis Square to the Cambridge border near Lechmere Square. Roughly 0.8 miles (1.3 km) of the path is finished and in use. The two finished segments feature pavement interspersed with brick, and surrounded by grass, trees, pedestrian connections to nearby streets, and a community garden. The path is lit at night and snowplowed in the winter.
If completed, the project would connect the Minuteman Bikeway, Fitchburg Cutoff Path, Alewife Brook Greenway and Cambridge Linear Park to the Charles River Bike Path and downtown Boston, Massachusetts. This would create connections for Bedford, Lexington, Concord, Arlington, Belmont, Somerville, and Cambridge to the proposed East Coast Greenway.
Famous quotes containing the words community and/or path:
“I do not mean to imply that the good old days were perfect. But the institutions and structurethe webof society needed reform, not demolition. To have cut the institutional and community strands without replacing them with new ones proved to be a form of abuse to one generation and to the next. For so many Americans, the tragedy was not in dreaming that life could be better; the tragedy was that the dreaming ended.”
—Richard Louv (20th century)
“Whoever heeds instruction is on the path to life, but one who rejects a rebuke goes astray.”
—Bible: Hebrew, Proverbs 10:17.