Snaefell Mountain Railway - Operation

Operation

Services operate at regular intervals between April and September, taking 30 minutes for a one-way journey. There is no winter service: the overhead wires on the exposed upper part of the route are dismantled to avoid damage from icing. All passenger traffic is carried in six wooden-bodied electric railcars, built in 1895 and numbered 1 to 6. Car 5 was burned out in an accident in 1970 and its body is a replacement built in 1971 to a similar design. The cars were re-equipped in the late 1970s with new bogies to a design based on the original, using motors and traction equipment from withdrawn Aachen trams. Because of the different gauge and the centre rail, vehicles cannot inter-run between the railway and the 3 ft gauge MER. Railway vehicles are occasionally worked to the MER workshops at Douglas by swapping their bogies, and to aid this there is a dual gauge siding in Laxey. The railway is owned and operated by Isle of Man Heritage Railways, a department of the Isle of Man Government.

Read more about this topic:  Snaefell Mountain Railway

Famous quotes containing the word operation:

    It is critical vision alone which can mitigate the unimpeded operation of the automatic.
    Marshall McLuhan (1911–1980)

    Waiting for the race to become official, he began to feel as if he had as much effect on the final outcome of the operation as a single piece of a jumbo jigsaw puzzle has to its predetermined final design. Only the addition of the missing fragments of the puzzle would reveal if the picture was as he guessed it would be.
    Stanley Kubrick (b. 1928)

    Human knowledge and human power meet in one; for where the cause is not known the effect cannot be produced. Nature to be commanded must be obeyed; and that which in contemplation is as the cause is in operation as the rule.
    Francis Bacon (1560–1626)