Schynige Platte Railway - History

History

  • 1890 The concession for the line was given and the company is founded on 16 September.
  • 1891 Construction starts.
  • 1893 A train with special guests reaches the top on 5 May and the line opens to the public on 14 June.
  • 1896 The Berner Oberland Bahn become the new owners.
  • 1914 The line was electrified. Electric services start on 9 May.
  • 1928 The Alpine Garden opens on the Schynige Platte.
  • 1964 The Schynige Platte Railway receives 4 locomotives from the Wengernalpbahn.
  • 1970 The Schynige Platte Railway receives 2 more locomotives from the Wengernalpbahn.
  • 1978 The Schynige Platte Railway receives another locomotive from the Wengernalpbahn.
  • 2001 Teddyland opens on the Schynige Platte on 7 June.

Read more about this topic:  Schynige Platte Railway

Famous quotes containing the word history:

    The disadvantage of men not knowing the past is that they do not know the present. History is a hill or high point of vantage, from which alone men see the town in which they live or the age in which they are living.
    Gilbert Keith Chesterton (1874–1936)

    The steps toward the emancipation of women are first intellectual, then industrial, lastly legal and political. Great strides in the first two of these stages already have been made of millions of women who do not yet perceive that it is surely carrying them towards the last.
    Ellen Battelle Dietrick, U.S. suffragist. As quoted in History of Woman Suffrage, vol. 4, ch. 13, by Susan B. Anthony and Ida Husted Harper (1902)

    The true theater of history is therefore the temperate zone.
    Georg Wilhelm Friedrich Hegel (1770–1831)