Savannah River Site - Contract Changes

Contract Changes

Management of the Savannah River Site was to be bid in 2006, but the Department of Energy extended the contract with the existing partners for 18 months to June 2008.

In 2006 DOE decided to split the WSRC contract into two new separate contracts, i.e. the M&O Contract and the Liquid Waste Contract to be awarded before June 2008. Responding to the DOE RFP, the Savannah River Nuclear Solutions (SRNS), LLC - now a Fluor partnership with Honeywell, and Huntington Ingalls Industries (formerly part of Northrop Grumman) - submitted a proposal in June 2007 for the new M&O Contract. A team led by URS and including many of the WSRC partners also submitted a proposal. On January 9, 2008 it was announced that SRNS LLC had won the new contract, with a 90-day transition period to start January 24, 2008. However, the transition was delayed by a protest filed with GAO by the URS team on January 22, 2008. The GAO denied the protest on April 25. DOE-SR then directed SRNS to start transition on May 2 and take over operation on August 1, 2008.

Read more about this topic:  Savannah River Site

Famous quotes containing the word contract:

    The way in which men cling to old institutions after the life has departed out of them, and out of themselves, reminds me of those monkeys which cling by their tails—aye, whose tails contract about the limbs, even the dead limbs, of the forest, and they hang suspended beyond the hunter’s reach long after they are dead. It is of no use to argue with such men. They have not an apprehensive intellect, but merely, as it were a prehensile tail.
    Henry David Thoreau (1817–1862)

    A contract for better for worse is a contract that should not be tolerated.
    George Bernard Shaw (1856–1950)