After Apollo, the Saturn V was planned to be the prime launch vehicle for Prospector intended to deliver a 330kg robotic rover on the Moon similar to Lunokhod and the Voyager Mars probes, as well an upscaled version of the Voyager interplanetary probes. It was also to have been the launch vehicle for the nuclear rocket stage RIFT test program and the later NERVA. All of these planned uses of the Saturn V were cancelled, with cost being a major factor. Edgar Cortright, who had been director of NASA Langley, stated decades later that "JPL never liked the big approach. They always argued against it. I probably was the leading proponent in using the Saturn V, and I lost. Probably very wise that I lost."

The (canceled) second production run of Saturn Vs would very likely have used the F-1A engine in its first stage, providing a substantial performance boost. Other likely changes would have been the removal of the fins (which turned out to provide little benefit when compared to their weight); a stretched S-IC first stage to support the more powerful F-1As; and uprated J-2s for the upper stages.

A number of alternate Saturn vehicles were proposed based on the Saturn V, ranging from the Saturn INT-20 with an S-IVB stage and interstage mounted directly onto an S-IC stage, through to the Saturn V-23(L) which would not only have five F-1 engines in the first stage, but also four strap-on boosters with two F-1 engines each: giving a total of thirteen F-1 engines firing at launch.

The Space Shuttle was initially conceived of as a cargo transport to be used in concert with the Saturn V, even to the point that a "Saturn-Shuttle," using the orbiter and external tank, but with the tank mounted on a modified, fly-back version of the S-IC, would be used to power the Shuttle during the first two minutes of flight, after which the S-IC would be jettisoned (which would then fly back to KSC for refurbishment) and the Space Shuttle Main Engines would then fire and place the orbiter into orbit. The Shuttle would handle space station logistics, while Saturn V would launch components. Lack of a second Saturn V production run killed this plan and has left the United States without a heavy-lift booster. Some in the U.S. space community have come to lament this situation, as continued production would have allowed the International Space Station, using a Skylab or Mir configuration with both U.S. and Russian docking ports, to have been lifted with just a handful of launches, with the "Saturn Shuttle" concept possibly eliminating the conditions that caused the Challenger Disaster in 1986.

Read more about this topic:  Saturn V

Famous quotes containing the words proposed and/or developments:

    The structure was designed by an old sea captain who believed that the world would end in a flood. He built a home in the traditional shape of the Ark, inverted, with the roof forming the hull of the proposed vessel. The builder expected that the deluge would cause the house to topple and then reverse itself, floating away on its roof until it should land on some new Ararat.
    —For the State of New Jersey, U.S. public relief program (1935-1943)

    The developments in the North were those loosely embraced in the term modernization and included urbanization, industrialization, and mechanization. While those changes went forward apace, the antebellum South changed comparatively little, clinging to its rural, agricultural, labor-intensive economy and its traditional folk culture.
    C. Vann Woodward (b. 1908)