Sable Offshore Energy Project - Fields

Fields

The fields of SOEP are being developed in two stage, with the cost of development of an estimated field life of 25 years. The Thebaud, North Triumph, and Venture were developed in the first stage and completed in 1999.

The first Phase II platform, Alma, came onstream in late 2003 while production from South Venture, the second field began late in 2004.

Read more about this topic:  Sable Offshore Energy Project

Famous quotes containing the word fields:

    I have passed down the river before sunrise on a summer morning, between fields of lilies still shut in sleep; and when, at length, the flakes of sunlight from over the bank fell on the surface of the water, whole fields of white blossoms seemed to flash open before me, as I floated along, like the unfolding of a banner, so sensible is this flower to the influence of the sun’s rays.
    Henry David Thoreau (1817–1862)

    Farewell green fields and happy groves,
    Where flocks have took delight.
    William Blake (1757–1827)

    Smart lad, to slip betimes away
    From fields where glory does not stay,
    And early though the laurel grows
    It withers quicker than the rose.
    —A.E. (Alfred Edward)