Route Availability - Route Availability of A Line

Route Availability of A Line

The route availability for a line is calculated taking in to account bridge strength, track condition, structural issues and so on. A route availability of one (RA1) is the most restricted line, open to possibly one type of locomotive specially designed for it. A route availability of 10 is the most open, usable by any locomotive that fits within the GB loading gauge that has been 'passed' for it (checked for conflicts with infrastructure such as platforms).

Read more about this topic:  Route Availability

Famous quotes containing the words route, availability and/or line:

    “no arranged terror: no forcing of image, plan,
    or thought:
    no propaganda, no humbling of reality to precept:
    terror pervades but is not arranged, all possibilities
    of escape open: no route shut,”
    —Archie Randolph Ammons (b. 1926)

    “Since ... six weeks ago, there has been no day in which I have not had letters and visits on the subject of my nomination for the Presidency.... I say very little. I have in no instance encouraged any one to work to that end.... I have said the whole talk about me is on the score of availability. Let availability do the work then.”
    —Rutherford Birchard Hayes (1822–1893)

    “This wild night, gathering the washing as if it were flowers
    animal vines twisting over the line and
    slapping my face lightly, soundless merriment
    in the gesticulations of shirtsleeves ...”
    —Denise Levertov (b. 1923)