Planned Second 380 KV Cable
There are plans to build a second 380 kV power line between Sorgente and Rizziconi. The line will have a transmission capacity of 2000 MW and will be 105 kilometres (65 mi) long, with an undersea portion of 38 kilometres (24 mi).
Read more about this topic: Pylons Of Messina
Famous quotes containing the words planned and/or cable:
“If little planned is little sinned
But little need the grave distress.
Whats dying but a second wind?
How but in zig-zag wantonness
Could trumpeter Michael be so brave?”
—William Butler Yeats (18651939)
“To be where little cable cars climb halfway to the stars.”
—Douglass Cross (b. 1920)