Technical Specifications of The Proposed Plant
The technical specifications of the plant in the original submission of the environmental review report (a less rigorous form of a full environmental assessment) to the Ontario Ministry of the Environment in November 2003 have been significantly altered. This was due to the government instructing Ontario Power Generation to stop participating in projects which use more environmentally acceptable generations systems, such as co-generation. Originally, the plant was described as two identical 275 MW power train systems, each comprising a 175 MW GE 7FA gas turbine generator, and other equipment. This proposed configuration was capable of producing over 272,000 kilograms per hour of steam for district heating. This design would, according to a PEC newsletter, allow for the efficiency of the plant to be “about 55% compared to 35% for a typical fossil power plant” There were also plans to include “Canada’s largest solar array” capable of producing “hundreds of kilowatts” though no actual specification seems to have ever been given.
Read more about this topic: Portlands Energy Centre
Famous quotes containing the words technical, proposed and/or plant:
“In effect, to follow, not to force the public inclination; to give a direction, a form, a technical dress, and a specific sanction, to the general sense of the community, is the true end of legislature.”
—Edmund Burke (17291797)
“...a fixed aim furnishes us with a fixed measure, by which we can decide whether such or such an action proposed is worth trying for or not, and as aims must vary with the individual, the decisions of any two people as to the desirableness of an action may not be the same.”
—Anna C. Brackett (18361911)
“Here come the line-gang pioneering by.
They throw a forest down less cut than broken.
They plant dead trees for living, and the dead
They string together with a living thread.”
—Robert Frost (18741963)