Technical Specifications of The Proposed Plant
The technical specifications of the plant in the original submission of the environmental review report (a less rigorous form of a full environmental assessment) to the Ontario Ministry of the Environment in November 2003 have been significantly altered. This was due to the government instructing Ontario Power Generation to stop participating in projects which use more environmentally acceptable generations systems, such as co-generation. Originally, the plant was described as two identical 275 MW power train systems, each comprising a 175 MW GE 7FA gas turbine generator, and other equipment. This proposed configuration was capable of producing over 272,000 kilograms per hour of steam for district heating. This design would, according to a PEC newsletter, allow for the efficiency of the plant to be “about 55% compared to 35% for a typical fossil power plant” There were also plans to include “Canada’s largest solar array” capable of producing “hundreds of kilowatts” though no actual specification seems to have ever been given.
Read more about this topic: Portlands Energy Centre
Famous quotes containing the words technical, proposed and/or plant:
“The best work of artists in any age is the work of innocence liberated by technical knowledge. The laboratory experiments that led to the theory of pure color equipped the impressionists to paint nature as if it had only just been created.”
—Nancy Hale (b. 1908)
“...a fixed aim furnishes us with a fixed measure, by which we can decide whether such or such an action proposed is worth trying for or not, and as aims must vary with the individual, the decisions of any two people as to the desirableness of an action may not be the same.”
—Anna C. Brackett (18361911)
“When they turn the sun
on again Ill plant children
under it, Ill light up my soul
with a match and let it sing....”
—Anne Sexton (19281974)