Ouvrage Village Coume - Design and Construction

Design and Construction

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Village Coume was approved for construction in May 1931. It was completed at a cost of 12 million francs by the contractor Duval-Weyrich of Nancy. The petit ouvrage was planned for construction in two phases. The second phase was to provide a separate entry block less than 100 metres (330 ft) behind the ouvrage.

Read more about this topic:  Ouvrage Village Coume

Famous quotes containing the words design and/or construction:

    Nowadays the host does not admit you to his hearth, but has got the mason to build one for yourself somewhere in his alley, and hospitality is the art of keeping you at the greatest distance. There is as much secrecy about the cooking as if he had a design to poison you.
    Henry David Thoreau (1817–1862)

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)