Design and Construction
The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Village Coume was approved for construction in May 1931. It was completed at a cost of 12 million francs by the contractor Duval-Weyrich of Nancy. The petit ouvrage was planned for construction in two phases. The second phase was to provide a separate entry block less than 100 metres (330 ft) behind the ouvrage.