Ouvrage Anzeling - Design and Construction

Design and Construction

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Anzeling was approved for construction in May 1931. It was completed at a cost of 122 million francs by the contractor La Parisienne d'Enterprises. The gros ouvrage is of the typical fort palmé ("palm-shaped") form for a large position. The fort palmé is a distributed fortification, with its entrances and underground support areas more than a kilometer to the rear, connected to the combat blocks by a long underground gallery. The "palm" is composed of the grouped combat blocks, linked by galleries to the main trunk.

Read more about this topic:  Ouvrage Anzeling

Famous quotes containing the words design and/or construction:

    Teaching is the perpetual end and office of all things. Teaching, instruction is the main design that shines through the sky and earth.
    Ralph Waldo Emerson (1803–1882)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)