Ouvrage Anzeling - Design and Construction

Design and Construction

The site was surveyed by CORF (Commission d'Organisation des Régions Fortifiées), the Maginot Line's design and construction agency; Anzeling was approved for construction in May 1931. It was completed at a cost of 122 million francs by the contractor La Parisienne d'Enterprises. The gros ouvrage is of the typical fort palmé ("palm-shaped") form for a large position. The fort palmé is a distributed fortification, with its entrances and underground support areas more than a kilometer to the rear, connected to the combat blocks by a long underground gallery. The "palm" is composed of the grouped combat blocks, linked by galleries to the main trunk.

Read more about this topic:  Ouvrage Anzeling

Famous quotes containing the words design and/or construction:

    Westerners inherit
    A design for living
    Deeper into matter—
    Not without due patter
    Of a great misgiving.
    Robert Frost (1874–1963)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)