Oklahoma State Highway 88 - History

History

State Highway 88 is first shown on the April 1941 state highway map, implying it was commissioned sometime between then and April 1940, when the previous map was published. SH-88 had an entirely gravel surface at that time. The 1948 map is the first that shows SH-88 with a wholly paved driving surface.

Prior to the construction of the Lake Oologah Dam, Highway 48 proceeded on a more southerly course north of Claremore, crossing the Verdigris River downstream of the current dam location and ending at US-169 south of Oologah. The 1965 map is the first to show the route crossing Oologah Dam. The route has had no further major changes since then.

Read more about this topic:  Oklahoma State Highway 88

Famous quotes containing the word history:

    No cause is left but the most ancient of all, the one, in fact, that from the beginning of our history has determined the very existence of politics, the cause of freedom versus tyranny.
    Hannah Arendt (1906–1975)

    This is the greatest week in the history of the world since the Creation, because as a result of what happened in this week, the world is bigger, infinitely.
    Richard M. Nixon (1913–1995)

    The history of all Magazines shows plainly that those which have attained celebrity were indebted for it to articles similar in natureto Berenice—although, I grant you, far superior in style and execution. I say similar in nature. You ask me in what does this nature consist? In the ludicrous heightened into the grotesque: the fearful coloured into the horrible: the witty exaggerated into the burlesque: the singular wrought out into the strange and mystical.
    Edgar Allan Poe (1809–1849)