Ohio State Route 795 - Major Intersections

Major Intersections

County Location Mile km Exit Destinations Notes
Wood
Perrysburg 0.00 0.00 - US 20 west
SR 199
Western terminus at signalized intersection.
US 20 comes in from northwest. Also northern terminus of SR 199.
0.22 0.35 - US 20 east Signalized intersection marking eastern split of US 20/SR 795 duplex.
US 20 departs to the southeast.
Rossford 2.27 3.65 - I-75 Exit 195 of I-75, a 4-ramp parclo AB-2 interchange, with all ramps on the south side.
Lake Township 6.16 9.91 6 E. Broadway Rd. 4-ramp parclo AB-2 interchange, with all ramps on the east side.
7.38 11.88 - Luckey Rd. Grade separation with connector roadway in NW quadrant.
9.06 14.58 - I-280 Exit 2 of I-280, a 4-ramp parclo AB-2 interchange, with all ramps on the north side.
Ottawa
Clay-Allen Township Line 12.20 19.63 - SR 51 Eastern terminus at signalized intersection.
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  • Concurrency terminus
  • Closed/Former
  • HOV
  • Incomplete access
  • ETC only
  • Unopened

Read more about this topic:  Ohio State Route 795

Famous quotes containing the word major:

    Let’s just call what happened in the eighties the reclamation of motherhood . . . by women I knew and loved, hard-driving women with major careers who were after not just babies per se or motherhood per se, but after a reconciliation with their memories of their own mothers. So having a baby wasn’t just having a baby. It became a major healing.
    Anne Taylor Fleming (20th century)