Passenger Transit
The initial startup cost is currently projected to be in the $500 million range. This does not include the cost of trains or the preparations needed for high-speed service. Currently, two high-speed train systems are being explored. The first, a 79 mph (127 km/h) system, is expected to cost $2.7 billion, or $3.5 million per mile. The second option, a 110 mph (180 km/h) high-speed system is estimated to cost $3.32 billion, or $4.5 million per mile.
Read more about this topic: Ohio Hub
Famous quotes containing the words passenger and/or transit:
“Every American travelling in England gets his own individual sport out of the toy passenger and freight trains and the tiny locomotives, with their faint, indignant, tiny whistle. Especially in western England one wonders how the business of a nation can possibly be carried on by means so insufficient.”
—Willa Cather (18761947)
“Theres that popular misconception of man as something between a brute and an angel. Actually man is in transit between brute and God.”
—Norman Mailer (b. 1923)