Operation
The first batch built consisted of six locomotives built by the Avonside Engine Company and they entered service in 1874 in Canterbury. Ten more were built in 1879, with a dozen more from Vulcan Foundry in 1883. However, one was lost at sea during while being delivered, and a replacement was built the following year. They spread beyond Canterbury and could also be found working in Auckland, Waikato, and Hawke's Bay. The J class worked well whether it was pulling a long goods train or operating important passenger services in the early days of the Main South Line, but as traffic increased, it was superseded by more powerful locomotives and in 1917-18, four members of the class were converted to 2-6-2 tank engines to perform shunting duties in yards. By 1935, all 32 original J class locomotives had reached the end of their usefulness and were discarded, and none survived to be preserved.
Read more about this topic: NZR J Class (1874)
Famous quotes containing the word operation:
“Waiting for the race to become official, he began to feel as if he had as much effect on the final outcome of the operation as a single piece of a jumbo jigsaw puzzle has to its predetermined final design. Only the addition of the missing fragments of the puzzle would reveal if the picture was as he guessed it would be.”
—Stanley Kubrick (b. 1928)
“It requires a surgical operation to get a joke well into a Scotch understanding. The only idea of wit, or rather that inferior variety of the electric talent which prevails occasionally in the North, and which, under the name of Wut, is so infinitely distressing to people of good taste, is laughing immoderately at stated intervals.”
—Sydney Smith (17711845)