New River Gorge Bridge - History

History

Construction began on the bridge in June 1974, and completed on October 22, 1977. It was designed by the Michael Baker Company, under the direction of Chief Engineer Clarence V. Knudsen, and executed by U.S. Steel's American Bridge Division. Final cost of construction was $37 million (approximately $4 million over bid). It is made from COR-TEN steel. The use of COR-TEN in construction presented several challenges; notable among them was ensuring that the weld-points weathered at the same rate as the rest of the steel.

Completion of the bridge cut the travel time from one side of the gorge to the other from about 45 minutes to 45 seconds.

Read more about this topic:  New River Gorge Bridge

Famous quotes containing the word history:

    “For a transitory enchanted moment man must have held his breath in the presence of this continent, compelled into an aesthetic contemplation he neither understood nor desired, face to face for the last time in history with something commensurate to his capacity for wonder.”
    —F. Scott Fitzgerald (1896–1940)

    “Every generation rewrites the past. In easy times history is more or less of an ornamental art, but in times of danger we are driven to the written record by a pressing need to find answers to the riddles of today.... In times of change and danger when there is a quicksand of fear under men’s reasoning, a sense of continuity with generations gone before can stretch like a lifeline across the scary present and get us past that idiot delusion of the exceptional Now that blocks good thinking.”
    —John Dos Passos (1896–1970)

    “While the Republic has already acquired a history world-wide, America is still unsettled and unexplored. Like the English in New Holland, we live only on the shores of a continent even yet, and hardly know where the rivers come from which float our navy.”
    —Henry David Thoreau (1817–1862)