Future Developments
The NJDOT is planning to rebuild the interchange at U.S. Route 46 and Valley Road in Clifton. This project will reconfigure ramps, bring bridges up to standard, and will provide for three-lane connections between Route 3 and U.S. Route 46. It was announced in 2003 and is projected to cost $200 million. There are also plans to rebuild Route 3 in the vicinity of the Passaic River crossing between Main Avenue in Clifton and Route 17 in Rutherford. In mid August 2007, the NJDOT announced that it would replace the bridge deck on the Route 3 drawbridge over the Passaic River with a fixed span. This project took place during late 2007 at a cost of $3.7 million. Construction on the replacement bridge is to be finished in 2014. In addition to the replacement of the Passaic River bridge, many other bridges along Route 3 will be replaced and the road will be reconstructed to modern standards with noise walls installed. The entire project is projected to be complete in 2014.
Read more about this topic: New Jersey Route 3
Famous quotes containing the words future and/or developments:
“Every member of the family of the future will be a producer of some kind and in some degree. The only one who will have the right of exemption will be the mother ...”
—Ruth C. D. Havens, U.S. suffragist. As quoted in History of Woman Suffrage, vol. 4, ch. 13, by Susan B. Anthony and Ida Husted Harper (1902)
“I dont wanna live in a city where the only cultural advantage is that you can make a right turn on a red light.
Freedom from labor itself is not new; it once belonged among the most firmly established privileges of the few. In this instance, it seems as though scientific progress and technical developments had been only taken advantage of to achieve something about which all former ages dreamed but which none had been able to realize.”
—Hannah Arendt (19061975)