Future Developments
The NJDOT is planning to rebuild the interchange at U.S. Route 46 and Valley Road in Clifton. This project will reconfigure ramps, bring bridges up to standard, and will provide for three-lane connections between Route 3 and U.S. Route 46. It was announced in 2003 and is projected to cost $200 million. There are also plans to rebuild Route 3 in the vicinity of the Passaic River crossing between Main Avenue in Clifton and Route 17 in Rutherford. In mid August 2007, the NJDOT announced that it would replace the bridge deck on the Route 3 drawbridge over the Passaic River with a fixed span. This project took place during late 2007 at a cost of $3.7 million. Construction on the replacement bridge is to be finished in 2014. In addition to the replacement of the Passaic River bridge, many other bridges along Route 3 will be replaced and the road will be reconstructed to modern standards with noise walls installed. The entire project is projected to be complete in 2014.
Read more about this topic: New Jersey Route 3
Famous quotes containing the words future and/or developments:
“For a parent, its hard to recognize the significance of your work when youre immersed in the mundane details. Few of us, as we run the bath water or spread the peanut butter on the bread, proclaim proudly, Im making my contribution to the future of the planet. But with the exception of global hunger, few jobs in the world of paychecks and promotions compare in significance to the job of parent.”
—Joyce Maynard (20th century)
“The developments in the North were those loosely embraced in the term modernization and included urbanization, industrialization, and mechanization. While those changes went forward apace, the antebellum South changed comparatively little, clinging to its rural, agricultural, labor-intensive economy and its traditional folk culture.”
—C. Vann Woodward (b. 1908)