New Bullards Bar Dam - History

History

New Bullards Bar Dam was constructed by the Yuba County Water Agency. The agency was created through an act of the state legislature in 1959 specifically to construct a flood control reservoir in response to a flooding event in 1955. The bulk of the financing for the dam came from the issuance of revenue bonds. The dam was completed in 1969.

Read more about this topic:  New Bullards Bar Dam

Famous quotes containing the word history:

    All history attests that man has subjected woman to his will, used her as a means to promote his selfish gratification, to minister to his sensual pleasures, to be instrumental in promoting his comfort; but never has he desired to elevate her to that rank she was created to fill. He has done all he could to debase and enslave her mind; and now he looks triumphantly on the ruin he has wrought, and say, the being he has thus deeply injured is his inferior.
    Sarah M. Grimke (1792–1873)

    The history of all countries shows that the working class exclusively by its own effort is able to develop only trade-union consciousness.
    Vladimir Ilyich Lenin (1870–1924)

    Man watches his history on the screen with apathy and an occasional passing flicker of horror or indignation.
    Conor Cruise O’Brien (b. 1917)