Nabucco Pipeline - Construction

Construction

The Nabucco project is included in the EU Trans-European Energy Network programme and a feasibility study for the Nabucco pipeline has been performed under an EU project grant. The front end engineering and design (FEED) services of the pipeline, including the overall management of the local FEED contractors, the review of the technical feasibility study, route confirmation, preparation of the design basis, hydraulic studies, overall SCADA and telecommunications, GIS and preparation of tender packages for the next phase, was managed by UK-based consultancy Penspen. Starting from 14 December 2011, WorleyParsons was appointed as on owner's engineer.

According to Reinhard Mitschek, managing director of Nabucco Gas Pipeline International GmbH, construction of the pipeline is scheduled begin in 2013 and it would be operational by 2017.

Read more about this topic:  Nabucco Pipeline

Famous quotes containing the word construction:

    “Striving toward a goal puts a more pleasing construction on our advance toward death.”
    —Mason Cooley (b. 1927)

    “There’s no art
    To find the mind’s construction in the face.”
    —William Shakespeare (1564–1616)

    “No construction stiff working overtime takes more stress and straining than we did just to stay high.”
    —Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)