Electrification
The Morristown Line east of Dover Station is electrified, using 25 kV, 60 Hz AC overhead catenary wire. The line was electrifed in 1930 at 3kV DC, but was re-electrified around 1984 at the contemporary standard of 25 kV, 60 Hz. The connecting Gladstone Branch and Montclair-Boonton Line were also re-electrified at this time.
Map of all coordinates from Google Map of first 200 coordinates from Bing |
---|
Export all coordinates as KML |
Export all coordinates as GeoRSS |
Map of all microformatted coordinates |
Place data as RDF |
Name | Coordinates | Comments |
---|---|---|
Hoboken | 40°44′09″N 74°02′36″W / 40.7358°N 74.0433°W / 40.7358; -74.0433 (Hoboken (NJT)) | |
West End Junction | 40°44′30″N 74°04′02″W / 40.7416°N 74.0673°W / 40.7416; -74.0673 (West End Junction (NJT)) | |
Meadowlands Substation | 40°44′44″N 74°06′09″W / 40.7455°N 74.1026°W / 40.7455; -74.1026 (Meadowlands Substation (NJT)) | Supplied by dual 230 kV lines (P-2216 and C-2281) from Kearny and Athenia substations. |
Newark Broad | 40°44′53″N 74°10′30″W / 40.7480°N 74.1749°W / 40.7480; -74.1749 (Newark Broad (NJT)) | |
Orange | 40°46′17″N 74°14′07″W / 40.7713°N 74.2354°W / 40.7713; -74.2354 (Orange (NJT)) | |
South Orange (Disused) | 40°44′32″N 74°15′46″W / 40.7421°N 74.2628°W / 40.7421; -74.2628 (South Orange; Disused (NJT)) | |
South Orange / Maplewood | 40°44′17″N 74°16′02″W / 40.7381°N 74.2673°W / 40.7381; -74.2673 (South Orange / Maplewood (NJT)) | |
Milburn | 40°43′33″N 74°18′24″W / 40.7257°N 74.3068°W / 40.7257; -74.3068 (Milburn (NJT)) | |
Summit Substation | 40°43′29″N 74°23′18″W / 40.7248°N 74.3883°W / 40.7248; -74.3883 (Summit Substation (NJT)) | |
Convent Tie Station | 40°46′49″N 74°26′45″W / 40.7804°N 74.4457°W / 40.7804; -74.4457 (Convent (NJT)) | |
Morristown (Lake Pocahontas) | 40°48′27″N 74°28′43″W / 40.8076°N 74.4787°W / 40.8076; -74.4787 (Morristown/Lake Pocahontas (NJT)) | |
Denville | 40°53′02″N 74°29′02″W / 40.8840°N 74.4840°W / 40.8840; -74.4840 (Denville (NJT)) | |
Dover | 40°52′59″N 74°33′00″W / 40.8831°N 74.5500°W / 40.8831; -74.5500 (Dover (NJT)) | |
West Wharton Substation | 40°54′22″N 74°35′52″W / 40.9062°N 74.5979°W / 40.9062; -74.5979 (West Wharton Substation (NJT)) | Beyond end of catenary; 25 kV feed runs on wooden pole line |
Read more about this topic: Morristown Line