National Rail
The through platforms, 1-6, are on the north side of the station. Platforms 1-3 are served by trains starting and ending at Cannon Street. Services to and from Charing Cross use platforms 4-6 and a passing loop to the south of Platform 6. Platforms 5 & 6 are also served by First Capital Connect with its Thameslink Bedford to Brighton services via Luton, St Albans, St Pancras International, Farringdon, City Thameslink, Blackfriars and Gatwick Airport. Platform 6 is the busiest railway platform in Europe, due to the necessity of routing all trains heading to Charing Cross and Blackfriars through it. There is no Platform 7 as it closed in the major reconstruction of the 1970s.
The terminal platforms, 8-16, are on the south side of the station and are mostly served by Southern services to south London and the south coast.
-
London Bridge exterior
-
London Bridge interior
-
National Rail terminal platforms
-
Through platforms
Read more about this topic: London Bridge Station
Famous quotes containing the words national and/or rail:
“A good man will not engage even in a national cause, without examining the justice of it.”
—Samuel Richardson (16891761)
“We rail at trade, but the historian of the world will see that it was the principle of liberty; that it settled America, and destroyed feudalism, and made peace and keeps peace; that it will abolish slavery.”
—Ralph Waldo Emerson (18031882)